Boston, MA, US(change)
Search
Residential Real Estate For Sale
17 Dennett Rd
Winchester, Massachusetts 01890
LIKE NEW CONSTRUCTION! Schedule a showing today! Completely updated, spacious family home, freshly re-designed by local architect offering a wonderful open layout, with lovely entry foyer/mudroom, gourmet kitchen with oversized island, 2 sinks, & beverage fridge; all high end appliances. Adjacent family room with fireplace and built ins, dining area with custom built in bench, and a 4th bedroom/or sunroom complete the main floor. Second level offers 3 additional spacious bedrooms and 2 full baths; a large master with private bath. Mid-level mudroom and half bath welcome you in from the back yard with in-ground Gunite pool, lovely patio and spacious yard. Huge lower level family room with fireplace, bar area great for entertaining, and laundry room~ Lovely 3 season porch off the rear of the house offers a nice spring/summer/fall retreat overlooking beautiful conservation land along the rear of the property. 2 car attached garage with work area, new central A/C, and updated system
$1,125,000.00
MLS#:72184757
Listing Office:RE/MAX Leading Edge
Listing Agent:Kim Covino
Office Phone:(781) 729-5505
Bedrooms:4
Bathrooms:2
Half Baths:1
Address: 17 Dennett Rd
City:Winchester
State:Massachusetts
ZIP Code:01890
Property Type:Single Family
Lot Size:15300.00
Property Size:2260.00
Year Built:1968
Parking Spaces:6
Exterior:Wood
Exterior Features:Porch - Enclosed,Deck,Patio,Pool - Inground,Fenced Yard
Flooring:Wall to Wall Carpet,Hardwood
Instruction:Contact list agent Kim Covino call/text 781-249-3854 or kimcovino@verizon.net
Ad Location